WP 6 - Re-design of OWTs and estimates of cost saving
This WP will investigate possible cost savings from design using improved integrated analyses including soil interaction models compared to the traditional methods.


This WP will investigate possible cost savings from design using improved integrated analyses including soil interaction models compared to the traditional methods.